The ice and water shield is installed under the upper layer of underlayment and on top of the lower layer of underlayment.
Go To Pin
2
All shingles off the roof
All shingles are now off the roof and ready for all the new roofing components.
Go To Pin
3
Starter shingles and drip edge
As you can see from the arrows, the drip edge is under the starter shingles as it is supposed to be.
Go To Pin
4
Ice and water on low slope
In this picture, the low slope of this roof is covered in ice and water to protect it from heavy rains backing up and getting under the shingles.
Go To Pin
5
Order of component's
The arrows show you the order in which the components go down. Lower eaves get drip edge, synthetic underlayment, drip edge on the rakes, starter shingles, then the main shingles.